IUP ISI/MediaWiki-Silk/Scrum notes/2011-02-07: Difference between revisions
Appearance
OpenIDUser16 (talk | contribs) Created page with 'Scrum meeting of the 27/01/2011 == Work done since the last Scrum meeting == * Finish upload class * Finish AOTD applet * Refactor disconnect slot * Analyze Gilles Caulier plug...' |
OpenIDUser16 (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
* Peer programming | * Peer programming | ||
* End AOTD engine | * End AOTD engine | ||
* Begin Parser class | |||
== Encountered difficulties == | == Encountered difficulties == | ||
Line 24: | Line 25: | ||
* Continue plugin | * Continue plugin | ||
* Refactor slot connection in queries | * Refactor slot connection in queries | ||
* Finish parser Class |
Revision as of 12:40, 7 February 2011
Scrum meeting of the 27/01/2011
Work done since the last Scrum meeting
- Finish upload class
- Finish AOTD applet
- Refactor disconnect slot
- Analyze Gilles Caulier plugin
- install Digikam
- QnetworkAccessManager
- Begin properties regroupment
- Peer programming
- End AOTD engine
- Begin Parser class
Encountered difficulties
- Missing documentation about kipi plugin
Work to do until the next Scrum meeting
- Update sample edit
- Begin presentations for friday
- Continue refactoring
- Continue plugin
- Refactor slot connection in queries
- Finish parser Class