IUP ISI/MediaWiki-Silk/Scrum notes/2011-01-05: Difference between revisions
Appearance
No edit summary |
|||
Line 1: | Line 1: | ||
Scrum meeting du 05/01/2011 | Scrum meeting du 05/01/2011 | ||
== | == Work done since the last Scrum meeting == | ||
* Install operating systems and library | * Install operating systems and library | ||
Line 11: | Line 11: | ||
* Study project compilation | * Study project compilation | ||
== | == Encountered difficulties == | ||
* CDash documentation lakes | * CDash documentation lakes | ||
Line 20: | Line 20: | ||
* One computer is slow (too older) | * One computer is slow (too older) | ||
== | == Work to do until the next Scrum meeting == | ||
* Finish installing operating systems and library | * Finish installing operating systems and library |
Revision as of 17:56, 5 January 2011
Scrum meeting du 05/01/2011
Work done since the last Scrum meeting
- Install operating systems and library
- Make a prensentation for L3
- send emails to PO and technical contacts
- Make courses about C++ and Qt
- Study and install CDash
- Gitorious and IceScrum registration
- Study project compilation
Encountered difficulties
- CDash documentation lakes
- One computer missing
- 2 virtual machine problems
- Wifi connection (Eduroam)
- C++ experience
- One computer is slow (too older)
Work to do until the next Scrum meeting
- Finish installing operating systems and library
- Investigate library code refactoring
- Finish installing CDash and explain it
- Read C++/Qt & git tutorials
- Read project code
- Find another computer