Jump to content

Calligra/Schedules/2.5/Release Plan: Difference between revisions

From KDE Community Wiki
Cyrille (talk | contribs)
Cyrille (talk | contribs)
Line 36: Line 36:


== 2.5.3 ==
== 2.5.3 ==
* Tagging November 2th (no big merge on that day)
* Tagging October 5th (no big merge on that day)
* Release November 7th
* Release October 10th
 
The final release should happen within three weeks after the RC.

Revision as of 05:57, 6 September 2012

See also: Feature Plan, Quality Control

Note

Status: in development, Alpha

Freezes

Master is never frozen for features or strings. The branch calligra/2.5 is always frozen for features or strings.

Testing

Alpha (2.4.90)

  • Tagging May 25th (no big merge on that day)
  • Release May 30th

Beta (2.4.91)

  • Tagging and branching (calligra/2.5) June 15th (no big merge on that day)
  • Release June 20th

RC (2.4.92)

  • Tagging July 13th (no big merge on that day)
  • Release July 18th

Stable releases

2.5.0

  • Tagging August 3rd (no big merge on that day)
  • Release August 8th

2.5.1

  • Tagging August 26th (no big merge on that day) - 4c48c0be38d6
  • Release August 29th

2.5.2

  • Tagging September 7th (no big merge on that day)
  • Release September 12th

2.5.3

  • Tagging October 5th (no big merge on that day)
  • Release October 10th