Jump to content

IUP ISI/MediaWiki-Silk/Scrum notes/2010-10-11: Difference between revisions

From KDE Community Wiki
Alexandre (talk | contribs)
Gpaumier (talk | contribs)
copyedit
 
Line 3: Line 3:
== Work done since the last Scrum meeting ==
== Work done since the last Scrum meeting ==


* Finish the powerpoint presentation
* Finished the powerpoint presentation
* Chat with Guillaume on IRC
* Chatted with Guillaume on IRC
* Plan the sprint 1
* Planned the 1st sprint
* Valid user stories
* Validated user stories
* Get back and modify the kde-silk project from Gitorious
* Got back and modified the kde-silk project from Gitorious
* Talk about scrum meetings planning
* Talked about scrum meetings planning


== Encountered difficulties ==
== Issues encountered ==


* IceScrum bugs
* IceScrum bugs
Line 17: Line 17:
== Work to do until the next Scrum meeting ==
== Work to do until the next Scrum meeting ==


* Define a prelemilary architecture of the library
* Define a prelimilary architecture of the library
* Chat with “sebas” on IRC
* Chat with “sebas” on IRC
* Contact “ervin” about the tests
* Contact “ervin” about the tests
* Update the project vision
* Update the project vision
* Make the definition of done
* Make the definition of done

Latest revision as of 16:20, 12 October 2010

Scrum meeting of the 2010-10-11

Work done since the last Scrum meeting

  • Finished the powerpoint presentation
  • Chatted with Guillaume on IRC
  • Planned the 1st sprint
  • Validated user stories
  • Got back and modified the kde-silk project from Gitorious
  • Talked about scrum meetings planning

Issues encountered

  • IceScrum bugs
  • Trouble with internet connections

Work to do until the next Scrum meeting

  • Define a prelimilary architecture of the library
  • Chat with “sebas” on IRC
  • Contact “ervin” about the tests
  • Update the project vision
  • Make the definition of done