Jump to content

Calligra/Schedules/2.9/Release Plan: Difference between revisions

From KDE Community Wiki
Jstaniek (talk | contribs)
Jstaniek (talk | contribs)
No edit summary
Line 63: Line 63:
* Tagging Sat, October 31st
* Tagging Sat, October 31st
* Release Wed, November 4th
* Release Wed, November 4th
== 2.9.10 ==
* Tagging Sat, November 28th
* Release Wed, December 2nd
== 2.9.11 ==
* Tagging Sat, Jan 2nd
* Release Wed, Jan 6th


Subsequent release will be planned on a case-by-case basis.
Subsequent release will be planned on a case-by-case basis.

Revision as of 10:13, 30 October 2015

See also: Feature Plan, Quality Control

Note

Status: unreleased

Freezes

Master is never frozen for features or strings. The branch calligra/2.9 is always frozen for features or strings.

Testing

Beta 1 (2.8.90)

  • Tagging and branching (calligra/2.9) December 6th (no big merge on that day)
  • Release December 10th

Beta 2 (2.8.91)

  • Tagging January 11th
  • Release January 15th

Beta 3 (2.8.92)

  • Tagging February 8th
  • Release February 12th

Stable releases

2.9.0

  • Tagging February 22nd
  • Release February 26th

2.9.1

  • Tagging March 7th
  • Release March 11th

2.9.2

  • Tagging March 28th
  • Release April 1st

2.9.3

  • Tagging April 25th
  • Release April 29th -- Cancelled (even if it can be available for download in some distros)

2.9.4

  • Tagging May 2nd
  • Release May 6th

2.9.5

  • Tagging May 30th
  • Release June 3rd

2.9.6

  • Tagging July 4th
  • Release July 8th

2.9.7

(delayed 1 month because of regressions)

  • Tagging August 29th
  • Release September 2nd

2.9.8

  • Tagging Sat, October 3rd
  • Release Wed, October 7th

2.9.9

  • Tagging Sat, October 31st
  • Release Wed, November 4th

2.9.10

  • Tagging Sat, November 28th
  • Release Wed, December 2nd

2.9.11

  • Tagging Sat, Jan 2nd
  • Release Wed, Jan 6th

Subsequent release will be planned on a case-by-case basis.