Calligra/Schedules/2.9/Release Plan: Difference between revisions
Appearance
m →2.9.0 |
No edit summary |
||
Line 28: | Line 28: | ||
== 2.9.1 == | == 2.9.1 == | ||
* Tagging | * Tagging March 7th | ||
* Release | * Release March 11th | ||
== 2.9.2 == | == 2.9.2 == | ||
* Tagging | * Tagging March 28th | ||
* Release | * Release April 1st | ||
== 2.9.3 == | == 2.9.3 == | ||
* Tagging | * Tagging April 25th | ||
* Release | * Release 29th | ||
== 2.9.4 == | == 2.9.4 == | ||
* Tagging | * Tagging May 23rd | ||
* Release | * Release 27th | ||
Subsequent release will be planned on a case-by-case basis. |
Revision as of 15:04, 1 March 2015
See also: Feature Plan, Quality Control
Freezes
Master is never frozen for features or strings. The branch calligra/2.9 is always frozen for features or strings.
Testing
Beta 1 (2.8.90)
- Tagging and branching (calligra/2.9) December 6th (no big merge on that day)
- Release December 10th
Beta 2 (2.8.91)
- Tagging January 11th
- Release January 15th
Beta 3 (2.8.92)
- Tagging February 8th
- Release February 12th
Stable releases
2.9.0
- Tagging February 22nd
- Release February 26th
2.9.1
- Tagging March 7th
- Release March 11th
2.9.2
- Tagging March 28th
- Release April 1st
2.9.3
- Tagging April 25th
- Release 29th
2.9.4
- Tagging May 23rd
- Release 27th
Subsequent release will be planned on a case-by-case basis.