IUP ISI/MediaWiki-Silk/Scrum notes/2011-01-05: Difference between revisions
Appearance
No edit summary |
|||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Scrum meeting du 05/01/2011 | Scrum meeting du 05/01/2011 | ||
== | == Work done since the last Scrum meeting == | ||
* Install operating systems and library | * Install operating systems and library | ||
* Make a prensentation for L3 | * Make a prensentation for L3 | ||
* | * Send emails to PO and technical contacts | ||
* Make courses about C++ and Qt | * Make courses about C++ and Qt | ||
* Study and install CDash | * Study and install CDash | ||
* Gitorious and IceScrum | * Register on Gitorious and IceScrum | ||
* Study project compilation | * Study project compilation | ||
== | == Encountered difficulties == | ||
* CDash documentation lakes | * CDash documentation lakes | ||
* One computer missing | * One computer missing | ||
* 2 virtual machine problems | * 2 virtual machine problems | ||
* Wifi connection (Eduroam) | * Wifi connection problems (Eduroam) | ||
* C++ experience | * C++ experience | ||
* One computer is slow (too older) | * One computer is slow (too older) | ||
== | == Work to do until the next Scrum meeting == | ||
* Finish installing operating systems and library | * Finish installing operating systems and library | ||
* Investigate library code refactoring | * Investigate library code refactoring | ||
* Finish installing CDash and explain it | * Finish installing CDash and explain it to the team | ||
* Read C++/Qt & git tutorials | * Read C++/Qt & git tutorials | ||
* Read project code | * Read project code | ||
* Find another computer | * Find another computer |
Latest revision as of 18:53, 6 January 2011
Scrum meeting du 05/01/2011
Work done since the last Scrum meeting
- Install operating systems and library
- Make a prensentation for L3
- Send emails to PO and technical contacts
- Make courses about C++ and Qt
- Study and install CDash
- Register on Gitorious and IceScrum
- Study project compilation
Encountered difficulties
- CDash documentation lakes
- One computer missing
- 2 virtual machine problems
- Wifi connection problems (Eduroam)
- C++ experience
- One computer is slow (too older)
Work to do until the next Scrum meeting
- Finish installing operating systems and library
- Investigate library code refactoring
- Finish installing CDash and explain it to the team
- Read C++/Qt & git tutorials
- Read project code
- Find another computer