Jump to content

IUP ISI/MediaWiki-Silk/Scrum notes/2010-11-18: Difference between revisions

From KDE Community Wiki
Alexandre (talk | contribs)
Created page with 'Scrum meeting of 2010-11-18 == Work done since the last Scrum meeting == * Finish the L3 presentation * == Encountered difficulties == == Work to do until the next Scrum me...'
 
Manik971 (talk | contribs)
No edit summary
 
Line 4: Line 4:


* Finish the L3 presentation
* Finish the L3 presentation
*  
* Develop a second engine for wikipedia
* Develop widget settings and design
* Begin functions used by the widget


== Encountered difficulties ==
== Encountered difficulties ==


* graphic drivers problem


== Work to do until the next Scrum meeting ==
== Work to do until the next Scrum meeting ==


* Make the presentation for Friday
* Make the presentation for Friday
*
* Find a solution to kill our jobs

Latest revision as of 13:57, 18 November 2010

Scrum meeting of 2010-11-18

Work done since the last Scrum meeting

  • Finish the L3 presentation
  • Develop a second engine for wikipedia
  • Develop widget settings and design
  • Begin functions used by the widget

Encountered difficulties

  • graphic drivers problem

Work to do until the next Scrum meeting

  • Make the presentation for Friday
  • Find a solution to kill our jobs