IUP ISI/MediaWiki-Silk/Scrum notes/2010-10-11: Difference between revisions
Appearance
Created page with 'Scrum meeting of the 2010-10-11 == Work done since the last Scrum meeting == * Finish the powerpoint presentation * Chat with Guillaume on IRC * Plan the sprint 1 * Valid user ...' |
copyedit |
||
(One intermediate revision by one other user not shown) | |||
Line 3: | Line 3: | ||
== Work done since the last Scrum meeting == | == Work done since the last Scrum meeting == | ||
* | * Finished the powerpoint presentation | ||
* | * Chatted with Guillaume on IRC | ||
* | * Planned the 1st sprint | ||
* | * Validated user stories | ||
* | * Got back and modified the kde-silk project from Gitorious | ||
* | * Talked about scrum meetings planning | ||
== | == Issues encountered == | ||
* IceScrum bugs | * IceScrum bugs | ||
* Trouble with internet connections | |||
== Work to do until the next Scrum meeting == | == Work to do until the next Scrum meeting == | ||
* Define a | * Define a prelimilary architecture of the library | ||
* Chat with “sebas” on IRC | * Chat with “sebas” on IRC | ||
* Contact “ervin” about the tests | * Contact “ervin” about the tests | ||
* Update the project vision | * Update the project vision | ||
* Make the definition of done | * Make the definition of done |
Latest revision as of 16:20, 12 October 2010
Scrum meeting of the 2010-10-11
Work done since the last Scrum meeting
- Finished the powerpoint presentation
- Chatted with Guillaume on IRC
- Planned the 1st sprint
- Validated user stories
- Got back and modified the kde-silk project from Gitorious
- Talked about scrum meetings planning
Issues encountered
- IceScrum bugs
- Trouble with internet connections
Work to do until the next Scrum meeting
- Define a prelimilary architecture of the library
- Chat with “sebas” on IRC
- Contact “ervin” about the tests
- Update the project vision
- Make the definition of done