Jump to content

Calligra/Schedules/2.8/Release Plan: Difference between revisions

From KDE Community Wiki
Cyrille (talk | contribs)
No edit summary
Cyrille (talk | contribs)
No edit summary
 
(4 intermediate revisions by one other user not shown)
Line 40: Line 40:


== 2.8.4 ==
== 2.8.4 ==
* Tagging June 14th
'''Postponed because of found regressions [http://lists.kde.org/?l=calligra-devel&m=140386344927957&w=2]; 2.8.5 planned shortly instead.'''
* Release June 18th
* <strike>Tagging June 14th</strike>
* <strike>Release June 18th</strike>
 
== 2.8.5 ==
This release replaces 2.8.4.
* Tagging July 3
* Release July 5
 
== 2.8.6 ==
* Tagging September 20
* Release September 24
 
== 2.8.7 ==
* Tagging November 30th
* Release December 3rd

Latest revision as of 16:29, 20 November 2014

See also: Feature Plan, Quality Control

Note

Status: released

Freezes

Master is never frozen for features or strings. The branch calligra/2.8 is always frozen for features or strings.

Testing

Beta 1 (2.7.90)

  • Tagging and branching (calligra/2.8) November 30th (no big merge on that day)
  • Release December 3rd

Beta 2 (2.7.91)

  • Tagging January 11th (no big merge on that day)
  • Release January 15th

Beta 3 (2.7.92)

  • Tagging February 9th
  • Release February 12th

Stable releases

2.8.0

  • Tagging March 2
  • Release March 5

2.8.1

  • Tagging March 24th
  • Release March 28th

2.8.2

  • Tagging April 12th
  • Release April 16th

2.8.3

  • Tagging May 10th
  • Release May 14th

2.8.4

Postponed because of found regressions [1]; 2.8.5 planned shortly instead.

  • Tagging June 14th
  • Release June 18th

2.8.5

This release replaces 2.8.4.

  • Tagging July 3
  • Release July 5

2.8.6

  • Tagging September 20
  • Release September 24

2.8.7

  • Tagging November 30th
  • Release December 3rd